Completed tasks & projects for the year of 2024.

The data was sourced from project & task management software (ex: Trello); processed & combined by robot 🤖; sanitized, condensed, & reorganized by human 👨

Published: 08/03/2024 | Date range: 01/01/2024 - 08/01/2024

CONTENT

General & Exceptional Events

  • Troubleshoot AQA processes and applications.
  • Troubleshoot public services and processes during outages.
  • Debug, identify, research, and resolve outages and issues related to CMS and other public-facing services.
  • Provide assistance to Programming and NSA staff regarding application and service issues, including coordinating and organizing collaborative efforts and documentation.
  • Provide training for technical and non-technical staff as needed.
  • Provide training and technical updates to programming staff prior to taking annual leave.
  • Troubleshoot and provide guidance to OPS on link color upon PDF export for meeting agendas.
  • Modify Trello automation script to help OC with their reports.
  • Communicate and support staff on TAS cases, educate staff as needed.
  • Generate and maintain up-to-date sprint documentation.
  • Provide updates to management and executives adapted to familiar processes and materials.

ValleyAir, Community, Intranet CMS Installations

  • Run through templates and macros, fix issues based on v13 upgrade.
  • Manage users.

DCSJ

  • Confirm work to be done on vehicle list with OC.
  • Sprint sheet & documentation.
  • Build and stage frontend.
  • Locate and provide Rebate page from 2023.

Intranet

  • Add event calendar to Intranet main navigation.
  • Create a short training video on how to create and manage event calendar entries.
  • Calendar PDF preview conditional statement for modal.
  • Change DB server reference.
  • Make a new user account for Ryan Villane.
  • Set up an intranet calendar with an entry generation process for HAL/internal events.

Analytics Data

  • Finish GA4 property migration.
  • Set up MS Clarity and connect GA4 properties.
  • Compile main nav items into a spreadsheet, run GA and populate with data, distribute to Directors associated with top-level nav items.
  • Compile 2023-24 Residential Wood Smoke Reduction Program website data for GB item.
  • Produce a range of how many documents are posted weekly and monthly to the CMS.

CSR

  • Build out Community landing page and child pages in ValleyAir CMS.
  • Provide CMS training for CSR and OC staff.
  • Review and edit Arvin/Lamont mower event materials/assets.
  • Provide a short URL for Arvin/Lamont event.

CMS/Migration

  • Look over the scaling fix during zoom in/out events.
  • Events/meetings logic: update regex to match multi-day descriptions.
  • 503 page for general “service unavailable”.
  • Add WW2 main nav to Public Permits Information Portal, set up similar to Archive.
  • Work with directors on the copy and content of Online Services.
CMS/Migration / Document Table
  • Title display issue.
CMS/Migration / Landing
  • Background switcher.
  • Research, design, and implement a solution for a full-page background.
  • Adjust column height to include all public meeting list items in view on most viewport sizes.
  • Add content in “Learn More” column, consult OC.
  • Fix landing slider vertical sizing.
  • Upcoming events modal dumping HTML in plain text.
CMS/Migration / Main Nav
  • Review how links in navigation open, edit anything that opens in a new tab to open in the same tab.
  • Add “Refinery Community and Fenceline Air Monitoring” link under “Air Quality”.
  • Stage most recent changes for review before propagating them to the main template.
  • Alphabetize sub nav for every top-level nav item.
CMS/Migration / Public Meetings
  • Update options to move forward – static, dynamic, hybrid, etc.
  • Add exceptions/conditions for cancellations and continuations.
  • Update archive public meeting table pages to fix view errors.
  • Update current meeting tables to resemble the Archive meeting tables.
  • Show meeting schedules on public meeting landing pages, move meeting info to a new child page.
  • Add “year” label to year drop down, reduce input size and center.
  • Remove “upcoming meetings” list and adjust layout.
  • Solve “upcoming meetings” list.
  • Additional conditional logic for every public meeting type except for Workshops: build year button list and change iframe source URL.
CMS/Migration / Public Meetings Macro
  • Fixed cache busting method for iframe source, duplicate URL parameter and updating.
  • Fixed form control zoomed-out display issues.
  • Missing May on the first of May (see conditional logic).
  • Remove responsive features, modify table to scale to at least iPhone Max viewport size before horizontal scrolling takes effect.
  • Add all meeting dates (rows) to public meeting tables.
  • Remove first line of content for “no current fires” per Jon K’s instructions.
  • Add “clean air rooms” link to internal navigation.
  • Add note below AQI maps per AQA instructions.

Grants

  • Landing page for lawnmower trade-in events.
  • Reconcile lists and send final Stockton list to group.
  • Replace header image for new fork lift replacement program.

Archive

  • Modify all archive meeting tables for all meetings, batch edit.
  • Finish updating HB public meeting tables to VADS.
  • Add, remove, update, modify, coordinate work on etc. various featured items on the old/static landing page per Management team instructions.

Kiteworks

  • Configure with VADS assets.

ESRI

  • Attend online webinar/training.
  • Put together a Site (archub) based on VADS.
  • Remove “BPS” (permitting) from all website navigations per Brian C’s instructions.